Project

General

Profile

Activity

From 05/11/2010 to 06/09/2010

05/20/2010

04:57 PM Task #1354 (Fixed): better network ping sweep script
Brad Neuman
04:32 PM Revision 302: fixed pingTest for real now
Red Robot
04:30 PM Revision 301: fixed infinite loop bug with pingTest
Brad Neuman
04:15 PM Revision 300: improved pingTest
Brad Neuman
03:53 PM Bug #1363 (Assigned): Tooltron status indicator
There should be some way of indicating if tooltron is working. There should be something on the website and a physica... Brad Neuman
03:51 PM Bug #1164 (Fixed): fix ERROR emails
Brad Neuman

05/13/2010

09:11 PM Bug #1358 (Fixed): cable on wood bandsaw seems broken
Resoldered a broken wire at the connector. The solder blob got really large so some electrical tape was put around th... Kevin Woo
09:10 PM Task #1348 (Fixed): reprogram bootloaders to deal with eeprom
This was done in the last upgrade session. All current tools (1-6) have been upgraded to use majority. Kevin Woo
09:09 PM Bug #1359 (Fixed): Green button on the wood bandsaw is stuck
Tightening the screws too much seems to press something against the back of the button preventing it from releasing. ... Kevin Woo
09:08 PM Bug #1356 (Fixed): Tool 3 resetting
Reprogramming fixed it Kevin Woo

05/12/2010

06:24 PM Task #1360 (Fixed): add CNC support to server
Brad Neuman
06:00 PM Revision 299: added CNC, needs testing
Brad Neuman
05:29 PM Task #1361 (Assigned): order more boards and replace drill-press 1
Drill press 1 seems like it has a weak board. It is the board which had those random eeprom bit flips and just now it... Brad Neuman
08:19 PM Bug #1188 (Fixed): tooltron does not check if members have paid dues
Brad Neuman
08:17 PM Revision 298: fixed payment bug
Brad Neuman
08:11 PM Revision 297: fixed payment date bug (possibly)
Brad Neuman

05/11/2010

07:50 PM Task #1360 (Fixed): add CNC support to server
Brad Neuman
07:36 PM Enhancement #1165 (Wontfix): send email when tooltron recovers
Brad Neuman
07:35 PM Task #1024 (Fixed): split logs based on date
Brad Neuman
07:35 PM Task #1178 (Fixed): detect cosmic bit flips
Brad Neuman
07:35 PM Task #1201 (Duplicate): Document the Server
Brad Neuman
07:35 PM Task #1349 (Fixed): reprogram tools to respond to TT_GRANT
Brad Neuman
07:30 PM Revision 296: added hack for running screen as a daemon, still need to handle logging and get rid...
Red Robot
06:28 PM Revision 295: adding install and daemon stuff
Red Robot
06:11 PM Bug #1359 (Fixed): Green button on the wood bandsaw is stuck
Brad Neuman
05:09 PM Revision 294: updated to use TT_GRANT instead of deprecated TT_ON, and also updated test/main.c t...
Red Robot
04:07 PM Bug #1358 (Fixed): cable on wood bandsaw seems broken
needs to be wiggled to the right spot to give the tool power Brad Neuman
03:23 PM Revision 293: fixed bootloader
Brad Neuman
03:20 PM Revision 292: Added majority for the toolbox
Kevin Woo
02:41 PM Task #1353 (Fixed): test Nicos cable
Kevin Woo
02:41 PM Task #1352 (Fixed): redo cable ties
Kevin Woo
02:29 PM Revision 291: one bugfix to payment date thing and made the test program that sets eeprom call pa...
Brad Neuman
02:24 PM Revision 290: New eeprom defines
Kevin Woo
03:13 AM Revision 289: Fixed bad read light flashing tie for cardreader
Kevin Woo
03:13 AM Revision 288: Majority functions for bootloader
Kevin Woo
03:12 AM Revision 287: Bootloader changes for majority and optimized rs485 sending
Kevin Woo
 

Also available in: Atom