MeetingMinutes2014012¶
Status meeting¶
High Level Software¶
This week:
- Spent lots of time on BOM simulation. Fully functional.
Next week:
- Do BOM behavior in simulation.
Mechanical Team¶
This week:
- Agreed on tasks
- Bottom and Top layer planned to be designed by 2 weeks and then 3d printed
Next week:
Low Level Software¶
This week:
- Successfully tested BOM circuit. It will work with new capacitors.
Next week:
- Finalize protocol over i2c so we can finalize BOM code.
Electrical Hardware¶
Last week:
- Tried to test the BOM, had the wrong capacitors.
Next week:
- Switching to Udoo for the main board! We'll design a sheild for it.