New:-Charging Station intial DesignUpdates:-Added wiring route beside battery-Updated battery support access holes-Modified rBOM support for tighter finish-Lengthened rear delrin to isolate wheels-Added material back to rear chassis from cliff mounting tabs
Updated design:larger wire passagewayPCB now 3.5x4.75" largeFront Cover for PCBMinor chassis tweaks
Added accessory development projects: Forklift & Hauler. Updated flat patterns for wire routing re-design. Added tilted sonar mounting block.
Redesign for use of Matbotix EZ1 Tunable Sonar rangefinders. Inclusion of rear charging port and homing beacons, left and right color sensors, rear attachment hardpoints, rear attachment 6pin molex connector (5V, 3.3V, GND, TX, RX, ADC1, INT1, INT2)
Redesign of baseplates to incorporate roll cage structure and to accomodate waterjet machining. Addition of pivot rear IR sensors for forward, side, and rearward distance measurement. Vehicle ride height increased to add ground clearance and provide channel for wire routing.
Added Rollcage to protect circuitry and sensors. Updated baseplate for added digital IR cliff sensors.
Added GP2Y0D810 Sensor.SLDPRT for cliff detection and updated Sensor PCB.SLDPRT for hole clearances. Modified Bumper.SLDPRT for digital IR sensor housing clearance and added screws for mounting.
Updated hole positions and material sizes based on Scout prototype.
Added holes to Front Baseplate.SLDPRT for IR mount. Also created prints for the PCB standins and Side IR Mount.
Updated Baseplates for Encoder Header access
Added CAD Models and supporting documentation/research