Activity
From 05/12/2010 to 06/10/2010
05/20/2010
- 04:57 PM Task #1354 (Fixed): better network ping sweep script
- 04:32 PM Revision 302: fixed pingTest for real now
- 04:30 PM Revision 301: fixed infinite loop bug with pingTest
- 04:15 PM Revision 300: improved pingTest
- 03:53 PM Bug #1363 (Assigned): Tooltron status indicator
- There should be some way of indicating if tooltron is working. There should be something on the website and a physica...
- 03:51 PM Bug #1164 (Fixed): fix ERROR emails
05/13/2010
- 09:11 PM Bug #1358 (Fixed): cable on wood bandsaw seems broken
- Resoldered a broken wire at the connector. The solder blob got really large so some electrical tape was put around th...
- 09:10 PM Task #1348 (Fixed): reprogram bootloaders to deal with eeprom
- This was done in the last upgrade session. All current tools (1-6) have been upgraded to use majority.
- 09:09 PM Bug #1359 (Fixed): Green button on the wood bandsaw is stuck
- Tightening the screws too much seems to press something against the back of the button preventing it from releasing. ...
- 09:08 PM Bug #1356 (Fixed): Tool 3 resetting
- Reprogramming fixed it
05/12/2010
- 06:24 PM Task #1360 (Fixed): add CNC support to server
- 06:00 PM Revision 299: added CNC, needs testing
- 05:29 PM Task #1361 (Assigned): order more boards and replace drill-press 1
- Drill press 1 seems like it has a weak board. It is the board which had those random eeprom bit flips and just now it...
Also available in: Atom